Track Record
100 water and wastewater projects completed since 1995 across Malaysia and Southeast Asia.
Engineering, Procurement, Construction and Commissioning (EPCC), delivered.

Pembinaan Rangkaian Paip Pembetungan & Rasionalisasi Loji Rawatan Kumbahan Kawasan Tadahan Batu, Jinjang/Kepong (Fasa 1) (Reka & Bina)
To construct, test and commission 5 nos. network pumping stations including rationalisation and demolition of existing STPs.

Sawah Raja Water Treatment Plant
Extension of existing 50MLD water treatment plant to 100MLD water treatment plant.

Sg Rawa Water Treatment Plant
Supply, install, testing and commissioning of new 40MLD treatment plant.

Nyabau Water Treatment Plant
Upgrading works of existing 7MLD water treatment plant to 15MLD water treatment plant, Phase 1 and Phase 2.

Muda River Water Scheme Phase 4A, Package 12 — Sungai Dua Water Treatment Plant
Supply, install and commission complete mechanical scope equipment for a new 25 MGD process treatment unit including sludge treatment facilities.

Sungai Bayor Water Treatment Plant at Sungai Bayor 2
Design and build new water treatment plant with operating capacity 5MGD and upgrading of existing plant.

Muda River Water Scheme Phase 4A, Package 10 — Sungai Dua Water Treatment Plant
Supply, install and commission complete mechanical scope equipment for a new 25 MGD process treatment unit.

Leachate Treatment Plant, Sg. Udang Sanitary Landfill
Supply, install and commission complete process equipment for 200 m³/day leachate treatment plant.

Batu Kitang Module 6 Water Treatment Plant
Turnkey project of Dissolve Air Floatation (DAF) system & installation of filtration and penstocks for 115MLD treatment plant.

Lojing Highland Water Treatment Plant
Design, supply and installation of 5MLD package water treatment plant.

Mempatih Water Treatment Plant
Design, supply and installation of 2.5MLD modular package process plant.

Air Itam Dam Filtration Plant
Supply, delivery, installation and commissioning of sludge dewatering system.

Lawin Water Treatment Plant
Upgrading from existing 3.4MLD water treatment plant to 13.6MLD water treatment plant.