Track Record

Ongoing Projects

No. Projects  Completion Date
1. Muda River Water Scheme Phase 4A Package 12-25 – MGD process units, intake, sludge settling tanks and related works at Sungai Dua WTP, SPU -
2. Package D43 – Construction of sewage pipe network and wastewater treatment plant at Batu, Jinjang-Kepong in Kuala Lumpur -
3. The Proposed Extension Of Phase 2 Sawah Raja Water Treatment Plant And Other Related Works (10MGD) Negeri Sembilan. Package 1: Cadangan Membina dan Menyiapkan Loji Rawatan Air Sawah Raja Fasa 2. -
4. Skim Bekalan Air Kerian, Daerah Kerian, Perak. Pakej 1 – Membina, Menyiap Dan Mentauliah Loji Rawatan Air Sungai Rawa Berkapasiti 40JLH Serta Kerja-Kerja Berkaitan – Sub-contract For Mechanical, Electrical And Instrumentation. -
5. Proposed upgrading of sewerage pumping station (10,500 PE) and sewerage treatment plant (26,000 PE) for “Permohonan Kebenaran Merancang Bagi Cadangan Mendirikan Bangunan 2 Blok Sovo 22 Tingkat, 1 Blok Podium Kompleks Belibelah Dan Kemudahan Berkaitan, 33 unit Kedai Pejabat 3 tingkat 22’ X 75’, 4 unit Kedai Galeri 3 Tingkat 33’ X 65’, 1 unit Kedai Galeri 3 tingkat 60’ X 50’, 4 unit Kedai Galeri 5 tingkat 44’ X 65’, 5 unit Kedai Pejabat 5 tingkat 42’ X 75’ 2 unit Kedai Pejabat 5 tingkat 59’ X 75’, dan 1 blok Menara Pejabat 15 tingkat, di atas Lot PT 4463, Lot 4465 di Pekan Bukit Kepayang, Daerah Seremban, Negeri Sembilan Darul Khusus. -
6. Design and build for proposed 325 P.E. sewerage treatment plant for proposed industry buildings at Lot 1377, 1690 & 1692 Mukim 12, Daerah Seberang Perai Selatan, Sungai Bakap, Pulau Pinang. -
7.  Design and build for the upgrading of sewerage treatment plant to 20,000 PE for proposed development on Lot 1253, 1254, Mukim 14, Daerah Seberang Perai Tengah, Lot 5782-5957, 6221-6486, 6488, Mukim 14, Daerah Seberang Perai Selatan & Lot 1661, 7381-7519, 7524-7531, 7673-7683, Mukim 15, Daerah Seberang Perai Selatan, Simpang Ampat, Pulau Pinang. -

Completed Project

No. Projects  Completion Date
1. Design and manage the water circulation and filtration systems for Waterfall Gardens and Reflection Pool for Sunway Lagoon extension project. Supply labour for erection of complete pumping and water treatment plant 15th January 1998
2. Design and manage the pumping and water treatment plant for K.L.C.C. Park project. Supply labour for erection of six numbers pumping and water treatment plants. 15th February 1998
3. Design and install rapid sand filters, pipework etc. for 31.4 MLD water treatment plant of Genting Sanyen Power Sdn Bhd. 30th November 1995
4. Supply and install modular laboratory furniture, fume cupboard, gas supply hot and cold water supply for New Kulim Water Supply Phase II. 30th August 1995
5. Dust collector system for lime handling at Sultan Idris Shah II W.T.P., Parit. 5th May 1995
6. Installation of instrument, air piping and stainless steel tubing for Samsung Corning factory at Seremban. November 1995
7.  Upgrading of waste water treatment plant for Genting Sanyen paper mill. Design and supply of piping, machinery installation as well as Project Management. October 1997
8. Erection of raw water pumping station for Muar Water Supply Contract 3B. September 1996
9. Supply of pipework, and mechanical installation work on water and waste water treatment for Milk Speciality Sdn Bhd. 15th October 1996
10. Supply of pipes, valves, strainer and installation of submersible pumping at Worldwide Sita. March 1997
11. Supply of pipes and installation of waste water treatment plant equipment at Dash Medical Gloves, Shah Alam. March 1997
12. Design, supply and install the pumping plant equipment for Pandan Safari Parade Water Theme Park. 15th August 1997
13. Supply labour and machinery to lay 250mm dia. M.S.C.L. pipes for Kota Kemuning Housing Scheme, Phase IP 3. 31st August 1997
14. Supply, delivery, erection, testing and commissioning of M&E equipment and associated works of filtration plant. 28th January 1998
15. Supply labour, machinery, tools and material to install the plant equipment at treated water pumping station for Sungai Selangor Project. 30th June 1998
16. Sri Gading Water Supply Project. Contract No. RC 1/2. Supply and Installation of Surge Suppression Works. 15th November 1998
17. Supply labour, machinery and tools to install the plant equipment at Batu Booster Pumping Stations for Sungai Selangor W.S.S. Phase 2 Stage 1. 31st December 1998
18. Supply and install mechanical and electrical system for one unit 200kw H.S.C. pumpset at Pinang Tunggal Water Treatment Plant, Kedah Darul Aman. 30th May 1999
19. Modification, improvement, extension, supply, delivery, erection and Construction to DAF system at Sultan Idris Shah II Water Treatment Plant. 24th May 1999
20. To supply, delivery, install and commissioning of M&E equipment at Sewage Pumping Station for Mid-Valley Project. Work Contract no. 7981-2. 28th February 1999
21. Supply, install and commissioning balance mechanical and electrical works for Sultan Idris Shah II Plant. 16th October 1999
22. Kuala Pilah Water Treatment Plant mechanical installation works. 31st December 1999
23. Design, supply, installation, testing and commission completely independent Chlorine Gas Scrubber Plant for Sultan Idris Shah II, Parit and Ulu Kinta Water Treatment. 30th March 2000
24. Upgrading of Kid’s Playground at Bukit Merah, Water Theme Park. 31st May 2000
25. Bandar Nusajaya Phase 1 – M&E and Electrical Work at 25 ML concrete reservoir. Contact No : PROLINK/INF/006/96 30th September 2000
26. Greater Ipoh II Water Supply Scheme Turnkey Project – Upgrading of Raw Water Pumping Station and associated works at SIS II Water Treatment Works, Parit. 12th January 2001
27. Contract for refurbishment of two (2) units Rapid Gravity Sand Filters at Bukit Pinang Treatment Plant, Alor Setar, Kedah Darul Aman. 19th January 2001
28. Design, supply, installation, testing and commissioning of batched fluoride dosing system in Ulu Kinta Water Treatment Plant. 29th December 2000
29. Upgrading of Raw Water Pumping Stations at Loji Air Bukit Pinang – Supply, Install, Test and Commissioning of the Submersible Pump System. 19th December 2001
30. Greater Ipoh II Water Supply Scheme Turnkey Project-Design, supply, erection and commissioning of Lime Silo Storage system c/w Ancillary Works and Dosing System at SIS II Water Treatment Plant, Parit, Perak Darul Ridzuan. 12th March 2002
31. Replacement of two (2) units Treated Water Pumpsets and Ancillary Works at Bukit Pinang Treatment Plant (Phase II & III), Alor Setar, Kedah Darul Aman. 31st January 2003
32.  Merekabentuk, membekal, memasang dan mentauliahkan Pam Air Mentah serta kerja-kerja berkaitan bagi Loji Air Pelubang, Daerah Kubang Pasu, Kedah Darul Aman. 24th September 2003
33. Replacement of two (2) More Units Treated Water Pumpsets and two (2) Units Air Blowers for Loji Air Bukit Pinang. 14th August 2003
34. Turnkey Project-Kerja-kerja membaikpulih dan menaiktaraf Loji Pembersihan Air Sungai Kampar, Kuala Dipang, Kampar, Perak Darul Ridzuan. 5th April 2004
35. Sungai Semenyih Chemical Plant Upgrade. 31st December 2004
36. Emergency Upgrading of the Sungai Petani Water Treatment Plant (Mechanical Works). 30th October 2004
37. Retrofitting to Lime Dosing Equipment at Sg. Dua Water Treatment Plant. December 2004
38. Bukit Pinang Treated Water Pumpset – Supply and installation of additional one (1) unit Treated Water Pumpset. 6th May 2005
39. Refurbishment of Lime Dosing Equipment at Loji Air Pinang Tunggal , Sungai Petani, Kedah Darul Aman. 31st July 2005
40. Bina/Pasang – Loji/Kolam Takungan dan Paip Utama Kerian ~ Kontrak No.2 Membaikpulih dan meningkatkan kapasiti Loji Air Jalan Baru dan Kerja-kerja Berkaitan. December 2005
41. Upgrading and refurbishment of Kg. Paloh Water Treatment Plant. 31st December 2005
42. Kerja-kerja membaikpulih dan menaiktaraf Loji Pembersihan Air Kroh III, Pengkalan Hulu, Perak Darul Ridzuan. 16th November 2005
43. Rehabilitation works and upgrading of desludging system at Sg. Semenyih Water Treatment Plant. 30th November 2005
44. Upgrading of PAC Dosing System for Loji Air Bukit Pinang , Kedah Darul Aman. 30th July 2006
45. Refurbishment of Lime Dosing System at Loji Air Pelubang, Kedah Darul Aman. 3rd August 2006
46. Supply, delivery, installation and commissioning of Streaming Current Detector (SCD) For Perbadanan Bekalan Air Pulau Pinang Sdn Bhd – Batu Ferringhi and Sg. Pinang Balik Pulau Water Treatment Plant. 30th November 2006
47. Turnkey Projek-Kerja-kerja membaikpulih dan menaiktaraf Loji Pembersihan Air Jelai, Batu Kurau, Perak Darul Ridzuan. 31st December 2006
48. Replacement, upgrading and automatic of filter backwash system at the Sg. Semenyih Water Treatment Plant – Mechanical works including upgrading and refurbishment of filter backwash system. 19th March 2007
49. Upgrading of one (1) unit In-line Booster Pumpset to low level Tanah Hitam Reservoir. 2nd November 2007
50. Urgent Refurbishment at Pelubang Treated Water Pumphouse. 7th November 2007
51. Construction and completion of the process, design, supply, fabrication, installation, testing and commissioning of all Process Equipment and associated M&E and C&S Works for Jelutong Sewage Treatment Pulau Pinang. – Mechanical installation works includes Pipes Laying, Penstock and Screen Installation, Welding and necessary Machinery Works. 31st March 2007
52.  Construction and completion of the process, design, supply, fabrication, installation, testing and commissioning of all Process Equipment and associated M&E and C&S works For Jelutong Sewage Treatment Work Pulau Pinang. – Supply, delivery, installation, testing and commissioning of Lime Plant and Carbon Plant. 15th March 2007
53. Pelubang Water Treatment Plant – Electric actuator for existing butterfly valve. May 2008
54. Proposed supply, delivery, installation, commissioning of Sludge Dewatering System for Air Itam Dam Filtration Plant Pulau Pinang. 14th May 2008
55. Supply, delivery, installation, testing and commissioning of upgraded and new Lime Storage and Lime Dosing Equipment at Sungai Dua Water Treatment Plant (WTP). 15th May 2008
56. Membekal, memasang, menguji dan mentauliah Pam Air Bersih serta kerja-kerja berkaitan di rumah Pam Galak "D" Keratong, Pahang Darul Makmur. Jun 2008
57. Refurbishment of existing lime dosing system at Sungai Ular Water Treatment Plant, Kulim, Kedah. 6th June 2008
58. Surge vessel for Loji Air Lubok Kawah, Temerloh, Pahang Darul Makmur – To design, supply, install, testing, commissioning and hand-over to JBA Pahang Darul Makmur one (1) set surge vessel as stated in Lampiran A. 24th June 2008
59. Bina/Pasang – Loji/Kolam Takungan dan paip utama Hulu Perak. Kontrak No.7 – Turnkey Projek : Kerja-kerja membaikpulih dan meningkatkan kapasiti loji pembersihan Air Lawin/Kenayat, Lawin, Perak Darul Ridzuan. 1st April 2009
60. Projek Taman Kekal Pengeluaran Makanan (TKPM) Di Batu 15, Jalan Apas, Tawau, Sabah. 8th May 2009
61. Membekal, memasang, mengujiterima dan mentauliah Pam Penggalak termasuk kerja-kerja elektrikal di kem Infantri, Batu 10, Kuantan, Pahang Darul Makmur. 25th August 2009
62. Ex-Bkt Bunga Water Treatment Plant, Besut, Terengganu and ex-Sg. Tong Water Treatment Plant, Setiu, Terengganu Darul Iman. 12th Oct 2009
63. Proposed Water Treatment Plant (105 l/s) at Payangan, Gianyar Regency, Bali, Indonesia ~ M&E Consultancy Services. 16th March 2010
64. Rancangan Bekalan Air Jerantut, Pahang Darul Makmur, Pakej A (i) – Cadangan membina dan menyiapkan loji Batu Embun, Daerah Jerantut, Pahang Darul Makmur.Kontraktor di namakan – membekal, menghantar, memasang, menyiapakan, menguji, mentauliahkan dan menjamin kerja-kerja Mekanikal, Instrument, Scada dan Elektrikal. 24th July 2010
65. Upgrading of Chlorine Plant at Sungai Dua Water Treatment Plant, Seberang Perai Utara, Pulau Pinang. – Contract No.: PBAPP/PR/41/08 31st May 2010
66. Upgrading of Booster Pump and Surge Vessel System at Ulu Kinta Booster Pumping Station. 15th June 2010
67. Skim Sg. Semenyih – Asset Replacement Works (ARW 2008). Contract No.: ABASS/WTP/ARW/55-2/2009 – Package 2 – Rehabilitation of Equipments and other related works at Post Chemical Plant, Sg. Semenyih Water Treatment Plant. 20th December 2010
68. Loji air di Lojing Highland, Gua Musang, Kelantan Darul Naim – Mechanical Work. 13th June 2011
69. Letter, build and turnkey contract for the proposed construction, completion and commissioning of Module 8 Water Treatment Plant and associated works, Kuching;- ‘A Complete Dissolve Air Floatation (DAF) System, Filtration and Penstock Installation Works’. 28th February 2011
70. Sibu Water Board : Design, Supply, Delivery and Installation of two (2) one Tone Lime Bulk Bag Station at Sibu Water Treatment Plant – Quotation on for M&E Work. 9th August 2011
71. Merekabentuk, membekal, memasang dan mentauliah ‘Clarifier’ dan ‘Filter’ berkapasiti 100m3/jam dari jenis ‘Modular Package Plant’ serta kerja-kerja berkaitan di Loji Air Mempateh, Daerah Termeloh, Pahang Darul Makmur. 26th April 2011
72. Loji Rawatan Air Sungai Kinta – Membekal dan mentauliah Proses Unit Penstock dan kerja-kerja berkaitan dengannya. 15th December 2011
73. Skim Sg. Semenyih – No. Kontrak : ABASS/WTP/31/2010‘Replacement and Upgrading Works of Pre-Chlorination System and associated works at Semenyih Water Treatment Plant’. 21st March 2012
74. Design and build of Water Supply System to Sunpower Plant, at Rembia, Alor Gajah, Melaka. 16th December 2011
75. Muda River Water Scheme Phase 4A – Package 10: 25 MGD Process Units and Associated Works, Sg Dua WTP, SPU – Mechanical & Process Work. 31st November 2011
76. Design, construct, test and commission two (2) units of Sed. Tanks with Lamella System at Phase 2, Sg. Dua Water Treatment for PBAPP Sdn Bhd. 2nd July 2012
77. Upgrading the Alum and Polymer Plant at Sg. Dua Water Treatment Plant for PBAPP Sdn Bhd. 30th June 2012
78. Refurbishment to existing Filter Bed No.6 Right Side at Sungai Dua Water Treatment Plant. 2nd Oct 2012
79. Design, supply, test and commission new Flocculators for Bukit Toh Allang Water Treatment Plant, Seberang Perai Utara, Pulau Pinang. Kontrak No: PBAPP/PR/38/11 27th November 2012
80. Projek Bekalan Air Luar Bandar (BALB) Sistem Retikulasi Tahun 2011/2012 Bagi Negeri Kelantan Darul Naim (Zon 2E) – Mechanical Works (Pumps). 31st March 2013
81. Bina/Pasang – Loji/Kolam Takungan dan paip utama Daerah Larut Matang dan Selama. Kontrak No.13 – Projek Turnkey: Menaiktaraf Loji rawatan air dan kerja-kerja bersampingan di Klian Gunung, Mukim Ijok, Daerah Selama, Perak Darul Ridzuan. 11th July 2013
82. Design, construct, test and commissioning one (1) unit of mixing chamber, Flocculation Tank and Sedimentation Tank at Bukit Toh Allang Water Treatment Plant, Seberang Perai Utara.Kontrak No: PBAPP/PR/25/12 31st July 2013
83. Projek Rehabilitation of Bukit Jelutong Water Treatment Plant – Pilot Plant Study. 16th August 2013
84. Supply, deliver and install Air Compressor and Dryer at Bukit Toh Allang Water Treatment Plant. 31st October 2013
85. Capex Special Project 2012 (Package 3). 2nd August 2013
86. Proposed Residential Village for Murum Hydro-Electric Project – Package Water Treatment Plant -
87. Proposed upgrading works of existing Nyabau Water Treatment Plant Phase 1 & Phase 2 Bintulu, Sarawak 12 March 2015
88. Projek pembangunan tapak pelupusan sisa pepejal sanitari (Fasa 1) Sungai Udang, Melaka 12 November 2014
89. Contract No.: LAP/04/002/2014 Bina/Pasang – Loji/Kolam takungan Dan paip utama Daerah Larut Matang & Selama Kontrak No.14 – Projek Turnkey: Kerja-kerja membaikpulih dan meningkatkan kapasiti loji rawatan air Sg. Selama, Perak Darul Ridzuan 29 March 2015
90. Design, supply and install a mini water treatment plant at Bukit Toh Allang Treatment Plant Jalan Ara Kuda, 13310 Tasek Gelugor, Seberang Perai, Pulau Pinang 11 Julai 2014